Close
Current temperature in Boston - 62 °
BECOME A MEMBER
Get access to a personalized news feed, our newsletter and exclusive discounts on everything from shows to local restaurants, All for free.
Already a member? Sign in.
The Bay State Banner
BACK TO TOP
The Bay State Banner
POST AN AD SIGN IN

Trending Articles

Former 1090 WILD-AM director Elroy Smith to host reunion for some of Boston’s best radio personalities

Breaking new ground: Break dancing debuts as sport at 2024 Paris Olympics

Roxbury affordable housing development goes fully electric — even when the power goes out

READ PRINT EDITION

COMMUTER RAIL SAFETY & RESILIENCY PROGRAM PROJECT MANAGEMENT

PUBLIC ANNOUNCEMENT

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
SOLICITATION FOR COMMUTER RAIL SAFETY & RESILIENCY PROGRAM PROJECT MANAGEMENT/CONSTRUCTION MANAGEMENT SERVICES
REQUEST FOR QUALIFICATIONS

The Massachusetts Bay Transportation Authority is soliciting project management and construction management (PM/CM) services for the Commuter Rail Safety & Resiliency Program, which includes the Positive Train Control (PTC) Program, the North Side Automatic Train Control (ATC) Program, and the Commuter Rail Fiber Optic Cable Network Resiliency Program.

The Scope of Services includes: 1) PM/CM services for the remaining two (2) years of the PTC Program; 2) PM/CM services for the ATC Program (four (4) years); 3) PM/CM and procurement services for the Commuter Rail Fiber Optic Cable Network Resiliency Program (three (3) years), with concurrent schedules. This may include, but is not limited to: Feasibility Surveys/Analyses; Multi-disciplined Engineering (i.e. Signal Systems, Communications Systems, Civil, Structural, Electrical, Mechanical); Environmental Approvals and Permitting; Security Design; Contract Management Assistance; Scheduling and Schedule Review; Quality Control/Quality Assurance; Construction Systems and Methods; Construction Planning; Construction Staging and Constructability; Construction Cost Estimating; Document Control; Public Outreach; Risk Analysis; Preliminary Design Services; Construction Management Services; and Testing and Commissioning Services. The conceptual level total program cost estimate for the proposed improvements is $838,000,000. The scope of services will be authorized on a task order basis by phase. The total duration of this contract will be five (5) years.

This project is expected to utilize Federal and non-federal funding. The DBE participation goal for this project is seventeen (17%) percent of the total amount authorized. In addition, the Authority strongly encourages the use of Minority, Women and Disadvantaged Business Enterprises as prime consultants, sub-consultants and suppliers in all of its contracting opportunities.

The complete Request for Qualifications can be found on the MBTA website.
Please see the following link:

http://bc.mbta.com/business_center/bidding_solicitations/current_solicitations/

This is not a Request for Proposal. The MBTA reserves the right to cancel this procurement or to reject any or all Statements of Qualifications.

Stephanie Pollack
MassDOT Secretary & CEO

Jeffrey Gonneville
Interim General Manager